#

Bathroom mixer installation

₹ 599.00 ₹ 799.00

(0 Reviews)

About Service

BATHROOM MIXER INSTALLATION SERVICE

ABOUT SERVICE

Our Bathroom Mixer Installation Service is designed to professionally install a new bathroom mixer tap on an existing water supply connection. Our trained technician checks the hot and cold water connections, ensures proper alignment, securely fits the mixer, and performs basic leakage and water-flow testing after installation.

SERVICE COVERAGE

• Bathroom mixer tap installation
• Wall-mounted mixer installation
• Hot and cold water mixer installation
• Bath/shower mixer installation
• Existing mixer removal, if required
• Mixer alignment and fitting
• Water connection checking
• Leakage and water-flow testing

WHAT'S INCLUDED

• Inspection of the existing water connections
• Removal of the old mixer, if required
• Installation of the new bathroom mixer
• Proper alignment and tightening
• Connection to existing hot and cold water lines
• Basic sealing of accessible connections
• Leakage inspection
• Basic water-flow testing

WHAT'S NOT INCLUDED

• Cost of the new bathroom mixer
• New or replacement water supply pipes
• Concealed pipeline repair
• Wall or tile breaking
• Civil or masonry work
• Major plumbing modification
• Bathroom tile repair or replacement
• Replacement of damaged wall fittings
• Any additional work outside the defined service scope

ESTIMATED SERVICE DURATION

Standard bathroom mixer installation generally takes 30–60 minutes. Actual service duration may vary depending on the condition and accessibility of the existing water connections and any additional plumbing work required.

BEFORE SERVICE

• Keep the bathroom mixer installation area accessible.
• Remove items blocking access to the water connections.
• Keep the new mixer and required accessories available.
• Inform the technician about any existing leakage or water-supply issue.

AFTER SERVICE

• Check all mixer connections for leakage.
• Turn on the water supply and test water flow.
• Check both hot and cold water outlets, where applicable.
• Avoid applying excessive force to the mixer handles.
• Contact Shandar Services if any service-related leakage or issue is noticed after installation.

WHY CHOOSE SHANDAR SERVICES

• Trained and experienced technicians
• Professional mixer installation
• Proper alignment and secure fitting
• Leakage and water-flow testing
• Transparent service process
• Quality-focused workmanship
• Convenient doorstep service
• Customer-friendly support

TERMS & CONDITIONS

• Service charges cover only the specified mixer installation work.
• Mixer and other spare parts are charged separately unless specifically included.
• Final charges may vary if additional plumbing work is required after inspection.
• Concealed plumbing issues are outside the standard service scope.
• Wall breaking, tile breaking, civil, and masonry work are not included.
• The customer must provide safe and reasonable access to the work area.
• Additional work will be carried out only after customer approval.
• Service availability may vary by location and technician availability.
• Any applicable service warranty will be subject to the terms communicated at the time of booking.

FAQS

Q1. Can you install a new bathroom mixer?
Yes. Our technician can professionally install a new bathroom mixer using the existing accessible water connections.

Q2. Does the service include the bathroom mixer?
The mixer is generally not included unless specifically mentioned in the booking. Spare-part costs may be charged separately.

Q3. Can you remove my old mixer before installing the new one?
Yes. Removal of the existing mixer can be included as part of the installation where the existing fittings are accessible.

Q4. Can you install a hot and cold water mixer?
Yes. We can install suitable hot and cold bathroom mixers when the required water connections are already available.

Q5. Will you check for leakage after installation?
Yes. The technician performs a basic leakage and water-flow check after installation.

Q6. How long does bathroom mixer installation take?
A standard installation generally takes around 30–60 minutes, depending on accessibility and the condition of the existing connections.

Q7. Can you repair damaged concealed water pipes during installation?
Concealed pipeline repair is outside the standard installation scope and may require separate inspection and additional work.